為達最佳瀏覽效果,建議使用 Chrome、Firefox 或 Microsoft Edge 的瀏覽器。

請至Edge官網下載 請至FireFox官網下載 請至Google官網下載
晴時多雲

限制級
您即將進入之新聞內容 需滿18歲 方可瀏覽。
根據「電腦網路內容分級處理辦法」修正條文第六條第三款規定,已於網站首頁或各該限制級網頁,依台灣網站分級推廣基金會規定作標示。 台灣網站分級推廣基金會(TICRF)網站:http://www.ticrf.org.tw

《TAIPEI TIMES》Domestic sub undergoes harbor tests

The Hai Kun, the nation’s first domestically built submarine, is transfered to a dry dock in Kaohsiung yesterday.
Photo: CNA

The Hai Kun, the nation’s first domestically built submarine, is transfered to a dry dock in Kaohsiung yesterday. Photo: CNA

2024/02/28 03:00

CRITICAL COMPONENTS: The tail was shielded because ‘enemy forces’ could estimate its speed and acoustic fingerprint by observing the propellers, an analyst said

Staff writer, with CNA

The nation’s first domestically built submarine prototype, the Hai Kun (海鯤號), yesterday was transferred to a dry dock for final harbor acceptance tests.

The prototype has been undergoing harbor acceptance tests at the factory of shipbuilder CSBC Corp, Taiwan (台灣國際造船) in Kaohsiung since October last year after an unveiling ceremony in late September.

On Monday evening, the prototype was towed from the CSBC factory to nearby Jong Shyn floating dock No. 8 and then transferred to a nearby dry dock, where the final tests were being conducted.

As the submarine was being moved out of the factory to the floating dock, a large number of spectators, including news media, shot videos and photographs of the Hai Kun, which had only been seen publicly once before, at an unveiling event on Sept. 28 last year, during which the bow, torpedo tubes and other critical components were concealed beneath a national flag.

CSBC chairman Cheng Wen-lon (鄭文隆) said at the time the measure was taken so as not to reveal of confidential parts of the submarine for security reasons, pending further testing.

When the prototype was moved on Monday, many of the previously concealed parts were visible, including its intercept sonar, flank sonar array and torpedo tubes.

The military did not explain why those elements were revealed after previously being covered.

However, there were some parts, including the tail, that were shielded from view at last year’s ceremony and remained that way during the move.

Shu Hsiao-huang (舒孝煌) of government-funded think tank the Institute for National Defense and Security Research, said the submarine’s tail remained shielded because “enemy forces” could estimate the prototype’s underwater speed and acoustic fingerprint by observing the number of its propellers, their angles and structural designs.

Retired navy captain Jiang Hsin- biao (江炘杓) said that yesterday’s tests at the dry dock were meant to make sure the submarine’s actual displacement is consistent with its original design.

Among the tests to be conducted would be an inclining test that is performed to determine the ship’s stability and the coordinates of its center of gravity.

Other tests at the dry dock would focus on separately testing the submarine’s equipment, ventilation system and engine, before running a comprehensive test by connecting the systems together, Jiang said.

Only after successful completion of the tests would the prototype move on to sea acceptance tests, the military and CSBC said.

Huang Shu-kuang (黃曙光), the head of Taiwan’s Indigenous Defense Submarine program, previously told reporters that the prototype would complete both sets of tests before being delivered to the navy at some point before the end of this year.

In other news, among the first batch of 655 draftees for the new one-year conscription period who reported for training last month, 117 have signed up to serve in the volunteer military force, the Ministry of National Defense said yesterday.

The figure, higher than the number of draftees who signed up last year during the same period of their four-month conscription, shows that the conscripts find the military and their salaries agreeable, Deputy Minister of National Defense Po Horng-huei (柏鴻輝) said.

The starting salary for conscripts was increased to more than NT$20,000 a month from NT$6,510 after the government extended compulsory military service from four months to one year.

新聞來源:TAIPEI TIMES

The Hai Kun, the nation’s first domestically built submarine, is pictured in Kaohsiung yesterday.
Photo: CNA

The Hai Kun, the nation’s first domestically built submarine, is pictured in Kaohsiung yesterday. Photo: CNA

不用抽 不用搶 現在用APP看新聞 保證天天中獎  點我下載APP  按我看活動辦法

焦點今日熱門
看更多!請加入自由時報粉絲團

網友回應

載入中
此網頁已閒置超過5分鐘,請點擊透明黑底或右下角 X 鈕。